Special Projects | Solid Waste Assessment | Live in UA? Shop in UA! | Volunteer UA | Historic Preservation | Kingsdale Preliminary Development Plan | Henderson Road Corridor Study
Henderson Road Corridor Study
Concept 1 | Concept 2 | Concept 3 | Concept 4
Traffic Calming Options 1 | Traffic Calming Options 2
On January 31, 2008 a public workshop was held to discuss the Henderson Road Corridor Study concepts and receive public input as to what improvements the community would like to see made to the section of Henderson Road between Sawmill Road and Riverside Drive.
The Henderson Road Corridor Study was begun in December 2007, with plans to present a final set of recommendations to City Council in the spring of 2008. Improvements under consideration include: the required number of lanes; pavement reconstruction; access and cross street locations; traffic control/calming options; pedestrian and bicycle facilities; drainage; and other necessary improvements required by the improvement approach that is ultimately implemented. The timeframe for any construction work is not known at this time.
Four concepts were presented as Cross Sections to provide an idea of what improvements may be considered as a part of this study. They are:
Concept 1 - Minimal Improvements
Concept 2 - Sidewalk on one side
Concept 3 - Bikeway and Sidewalk
Concept 4 - Three-lane road with bike path
It is important to note that these concepts are not in any way set.
Also provided are two exhibits detailing different “traffic calming” methods that may or may not be a good fit for the area.
Updated 3/08
Engineering Division
City of Upper Arlington
3600 Tremont Road
Upper Arlington, Ohio 43221
Phone: 614-583-5360
www.ua-ohio.net
|